Showing posts with label Novec 1230. Show all posts
Showing posts with label Novec 1230. Show all posts

Thursday, July 21, 2016

Marine Fire Suppression....No Worries with A-Gas

The Marine fire protection industry seems to bring lots of unease. Lots of factors play into the safety and sustainability of the systems on many vessels. This was an interesting article Marine Fire Protection: An Ungoverned Space. 






At A-Gas Americas you never have to wonder about the quality of product being filled into your Clean Agent marine cylinders. Each tank is shipped with a Certificate of Analysis, providing you and your customer with peace of mind. Contact us today for a quote!



Thursday, February 4, 2016

Purchase Clean Agents and get Recharges with Rebecca!


Rebecca Magers has joined the A-Gas Americas Fire Protection team! She is here to help you with all of your Clean Agent needs. Bulk, Recharges, whatever you need, she is ready to assist you!

Wednesday, August 12, 2015

Marine industry is moving towards Novec over Halon



This article touches on the move for the Marine industry to stop relying on Halon for critical use.





http://www.marinelink.com/news/offshore-workboat-safety391130.aspx

Tuesday, August 19, 2014

Largest Novec System in the country

Project profile: Installing a large clean agent system in a complex environment

A government data center opted for a clean agent suppression system to protect its mission critical facility.

08/07/2014

Figure 1: This shows the primary and secondary clean agent tank installation in the data center. Courtesy: Southland IndustriesSouthland Industries recently designed and installed one of the largest clean agent fire suppression systems in the nation. The stakes were high as the goal of the project was to protect sensitive data stored on hundreds of servers within a large government facility. The project was particularly complex not only due to its large size and stringent standards for security, but also because it needed to seamlessly integrate with a double interlock pre-action system and an energy-efficient containment method of air cooling.
The immediate challenge facing the design team centered on accommodating the agency’s requirement that the building have continuity of operations. The agency needed to be able to perform system maintenance and upgrades without losing power to the system or any of its functionality. Any kind of system disruption—even one consisting of only a few minutes—was simply not acceptable.
Designing and installing this clean agent system required not only meticulous planning, but also creative thinking that led to a set of innovative and smart solutions for the building owner. It served as a reminder that regardless of any apparent incompatibilities among systems performing different functions, there are ways to design and structure them so they operate as a cohesive whole.
To ensure continuity of operations, project engineers designed a double interlock pre-action system to reduce the chance of accidental water discharge in the event of a fire. This would assure that water would only be discharged as a last resort in the 66,000-sq-ft data center space. As a first line of defense, a clean agent system using 3M NOVEC gas would be used.
Figure 2: Installation, accessibility, and serviceability are key considerations in the storage tank arrangement. Courtesy: Southland IndustriesInstalling a clean agent system in such a massive area required a creative approach by the team. Regulations required that clean agent “storage containers shall be located as close as possible to or within the hazards they protect” (NFPA 2001, Section 4.1.3.2). But the configuration of the building was not conducive to situating the clean agent system close to these protected areas. The server room and mechanical gallery are located in the center of the second floor over a 3-ft raised floor. The ceiling height of the server room is approximately 12 ft, and the space above the ceiling to the deck is approximately 4 ft. The electrical power supply via switchgear equipment is located directly below the server room space. All of this made it impractical to place the clean agent tanks on the same floor as the servers.
Given these constraints, the team determined that the best solution would be to locate the clean agent primary and secondary supply tanks on the ground floor, even though the protected hazard—the servers and mechanical gallery—are located on the second floor, 20 ft above and several hundred pipe lengths away.
This complicated matters even further, requiring the team to ensure the clean agent system’s fire-extinguishing gases could just as efficiently reach the protected areas as they would if they were located closer to them. This meant making sure that the system was equipped with the appropriate amount of gas and was forceful enough to pump that gas into the areas.
None of the clean agent systems certified at that time were right for the job. The project required a newer system that had a higher discharge pressure. After thorough evaluation and analysis of needs, the team eventually settled on the 500 psi NOVEC 1230. The system was so new that it was still going through its final approval process by UL, a third-party listing agency, as it was being installed. A few months before the project was turned over to the owner, the system gained official UL approval.
In addition to the many challenges already identified, the team needed to address the issue of arranging the various fire life safety systems and MEP trades and equipment in a limited amount of space. The fire suppression piping, along with the other trades, required detailed coordination to prevent interference and a lack of constructability. To prevent potential conflicts, the piping was designed, planned, and coordinated in 3D to reduce field changes. This allowed for the inclusion of bracing in the clean agent piping (similar to seismic bracing) to hold the pipes in place against the force of pressure that is exerted when the clean agent gas is discharged. By strategically locating the pipe, any potential interference with the other trades was prevented.
Another focus of concern was the need to prevent pipe corrosion. It was important to make space for a nitrogen system to prevent corrosion of the pipes of the double interlocked pre-action system, which employs schedule 40 black steel pipe. Concern about future corrosion prompted the pre-action system to be supervised by an inert gas such as nitrogen in lieu of standard air. However, space was not made available on the second floor to accommodate the infrastructure needs of the nitrogen system. As a result, the nitrogen generator and storage tank had to be located on the first floor in the clean agent storage tank room. From there, the supervisory nitrogen is piped up from the first floor to the pre-action valves on the second floor. The pre-action valve is required to automatically revert to a non-interlock configuration in the event of a power loss. Upon the return of power, the pre-action valve returns to its standard release method.
Finally, the project also needed to meet the requirements of and be certified to U.S. Green Building Council LEED Gold, version 3.0. It would be registered through the Green Building Certification Institute, with performance goals based on a “high-performance green building” as defined by the Energy Independence and Security Act of 2007.
To reach LEED certification in a building with many servers, the agency employed the containment method using barriers to trap and direct airflow to control cooling. The challenge with this method, however, is that the structure created obstructions that would make it difficult for the clean agent gas to reach it. The hot aisle containment areas are large enough to walk in and therefore require sprinkler protection as well as clean agent protection. The aisle utilized ceiling grids down the center for lights and fire protection devices but had 2-ft-wide open areas along the length of the enclosure. To address this, the project team altered the clean agent nozzle locations so that they entered into each of the containment areas.

Corey Wallace is an associate principal engineer with Southland Industries. He holds a bachelor’s in mechanical engineering from the University of Mississippi and a master’s of engineering management from Christian Brothers University.

Wednesday, April 9, 2014

FSSA ANNUNCIATOR- A Monthly News Update from the FSSA- Issue 66, April 2014 - Bayesian Filter detected spam

MARKETING COMMITTEE UPDATE
Since the Annual Forum the marketing committee has been hard at work acting on many of the ideas framed at the strategic planning meeting in October.  
Over 30 members have already volunteered to serve and were divided amongst the three areas of focus - - Promoting, Educating, and Growing.
If you would like more information on the specific topics that fall under the aforementioned categories or if you are interested in joining this collaborative effort, please email Vince, at FSSA Headquarters.

TECHNICAL COMMITTEE MEETING
The next Technical Committee meeting will take place at the Hilton O'Hare Wednesday, June 18, 2014 in Chicago, IllinoisGuests are welcome. Click here to RSVP as a guest.

DUPONT INTRODUCES ITS SCIENCE OF PROTECTION TEAM
For those of you that attended the recent FSSA annual meeting in beautiful San Diego, California, we hope you had the opportunity to meet the DuPont Science of Protection Team.  We are an experienced group of DuPont professionals dedicated to the fire business.  Our mission is to help protect lives and critical assets through education/awareness of the value and importance of suppression systems. We strive to motivate end-users and consultants to specify clean agents for mission-critical applications and to provide you with the support and tools needed to succeed in this rapidly changing market.  Those of us that are new to the fire industry appreciate the warm welcome received at the annual meeting.
In addition to our current team, here is what you can expect from us:
  • Helen Lowery (an FSSA director) and Jed Seay will be circulating across the US and Canada.
     
  • Rob Lee will be emphasizing special projects and targeted market segments; looking for new market sectors for suppression and ways to remove barriers to sale in our traditional markets.
     
  • Jill Moncarz will be creating the tools we need to make our message more effective. 
We have also expanded our Global team by adding resources in other key regions.  So, if you have a particularly challenging situation, a potential suppression project or application that needs support, or just need help shedding some illumination on the wonders of clean agent fire protection, we can help. For more than 50 years, DuPont has provided reliable, cost-effective clean agent fire suppression solutions with a dedication to safety. Our long history of success is the result of a close and active working relationship with the critical suppression equipment providers, installing contractors, and the many agents of influence that engage in fire suppression projects.
For more information, call 1-800-473-7790.

FSSA TO EXHIBIT AT NFPA
The FSSA will be exhibitng at this years NFPA Conference & Expo in Las Vegas, NV.  Volunteers are welcome to help represent the FSSA.  Should you find yourself at the show this year and wanting to help in the booth email Vince Mullhausen at FSSA HQ.


MEMBERSHIP DUES NOTICE

It's that time of year again for the yearly renewal process.  Dues renewals will be sent out this month for the 2014-2015 calendar year.  Thank you to those who have already renewed for the upcoming year.

Questions about billing, payment, or maybe want to get a jump start on the process?  Please contact Jason Dumm, Financial Coordinator at headquarters for assistance.



2015 FSSA ANNUAL FORUM

The 2015 Annual Forum will be held next February 21 - 24 in Clearwater Beach, FL at the Sandpearl Resort.

More information coming soon.


FSSA TRAINING PROGRAM

The FSSA Training program is live!  If you reserved a spot at the forum invoices were emailed in May. For questions regarding the training program or to reserve your space, please contact Vince Mullhausen at FSSA HQ.






 

FSSA, the FIRE SUPPRESSION SYSTEMS ASSOCIATION, is a not-for-profit trade association, drawing members internationally. FSSA is a unique blend of designer/installers, manufacturers and suppliers working together to share ideas and strategies for the benefit of the fire suppression systems industry. FSSA members are dedicated to the highest level of safety, reliability and effectiveness of special hazards fire suppression.
 
The mission of FSSA is to promote the use of, and be the leading recognized authority on, special hazard fire protection systems; employing existing and new technologies to safeguard people, high-value assets and the environment.




Interested in passing along information on
FSSA to prospective members? FSSA has printed cards proclaiming "WHY Join the FSSA" with information on member benefits. If you would like a stack of cards mailed to you so that you can distribute them to your colleagues, please contact FSSA Headquarters.
tab2

Crista LeGrand, CAE, CMP
- Executive Director
Vince Mullhausen - Meetings & Member Services
Donna Liberto - Financial Manager
Jason Dumm - Financial Coordinator
(contact Jason for all membership dues & meeting registration payments or invoicing)
The complete archive of The Annunciator is available on the FSSA website. Click here to view.
 Please contact Vince Mullhausen at FSSA Headquarters if you would like to have a colleague added to the mailing list.

Copyright © 2013 Fire Suppression Systems Association. All rights reserved.